Integrated Transport Resource Catalog

Pepustakaan Pusat Kementerian Perhubungan Republik Indonesia

Title
EFEKTIVITAS CYCLE TIME GUNA MENINGKATKAN KEGIATAN TRANSHIPMENT DI PT. BORNEO INDOBARA PADA TAHUN 2019
Collection Location
Repository PIP Semarang
Edition
Call Number
ISBN/ISSN
Author(s)
NOVA, RHIZKY
Subject(s)
TALK
Classification
Series Title
GMD
Electronic Resource
Language
Publisher
Publishing Year
2024
Publishing Place
Collation
Abstract/Notes
ABSTRAKSI
Nova Rhizky Pahlevi.2020, NIT: 531611306211.K,“Efektivitas Cycle Time
Guna Meningkatkan Kegiatan Transhipment di PT. Borneo Indobara Pada
Tahun 2019”. Skripsi. Program Diploma IV, Program Studi
Ketatalaksanaan Angkutan Laut dan Kepelabuhanan, Politeknik Ilmu
Pelayaran Semarang. Pembimbing I: Irma Shinta, M.Pd., Pembimbing II:
Capt. Agus Hadi Purwantomo, M.Mar.
Perusahaan pertambangan batubara memiliki target produksi yang harus
dicapai pertahun. Pendistribusian batubara umumnya menggunakan transhipment,
kegiatan transhipment adalah pendistribusian yang menggunakan dua kapal
sebagai sarana pengangkutan agar batubara yang dikirim sampai ketempat tujuan.
Tujuan penelitian diperlukan untuk mengetahui hambatan yang terjadi dalam
kegiatan pendistribusian batubara dan upaya yang dilakukan untuk mengatasi
hambatan agar dapat berjalan dengan lancar dan memperoleh hasil semaksimal
mungkin.
Metode yang digunakan dalam penelitian ini adalah metode kualitatif,
teknik pengumpulan data menggunakan observasi, wawancara, dokumentasi dan
kemudian data dianalisis menggunakan teknik deskriptif analisis analisis.
Hasil penelitian menunjukkan bahwa terdapat beberapa yang terjadi dalam
kegiatan pendistribuasian batubara. Hambatan yang terjadi seperti rusaknya alat
bantu yang berada di jetty serta waiting assist tug dapat menghambat kelancaran
cycle time kegiatan transhipment. Saran untuk mengatasi hambatan yang terjadi
adalah menambah assist tug dalam kegiatan transhipment serta memperbaiki alat
bantu yang digunakan dalam kegiatan transhipment.




ABSTRACT
Nova Rhizky Pahlevi.2020, NIT: 531611306211.K, "Effectiveness of Cycle Time
to Increase Transhipment Activities at PT. Borneo Indobara in 2019 ”.
Essay. Diploma IV Program, Sea Transportation and Port Management
Study Program, Semarang Shipping Science Polytechnic. Advisor I: Irma
Shinta, M.Pd., Supervisor II: Capt. Agus Hadi Purwantomo, M.Mar.
Coal mining companies have production targets that must be met every year. Coal
distribution generally uses transshipment, transshipment activity is distribution
using two ships as a means of transportation so that coal is sent to its destination.
The research objective is needed to determine the obstacles that occur in coal
distribution activities and the efforts made to overcome the obstacles in order to
run smoothly and get the maximum possible results.
The method used in this research is qualitative methods, data collection techniques
use observation, interviews, documentation and then the data is analyzed using
descriptive analysis techniques.
The results showed that there were several things that occurred in coal
distribution activities. Obstacles that occur such as damage to the assistive devices
at the jetty and the waiting assist tug can hamper the smooth cycle time of
transhipment activities. Suggestions for overcoming the obstacles that occur are
adding an assist tug in transhipment activities and improving the tools used in
transshipment activities.
Specific Detail Info
//repository.pip-semarang.ac.id/2658/