ANALISA PENURUNAN KERJA CARGO OIL PUMP TURBINE DI MT.GEDE
Collection Location
Repository PIP Semarang
Edition
Call Number
ISBN/ISSN
Author(s)
DIMAS, AUGUST SEVENTEEN
Subject(s)
Teknika
Classification
Series Title
GMD
Electronic Resource
Language
Publisher
Publishing Year
2024
Publishing Place
Collation
Abstract/Notes
INTISARI
Dimas August S, 2019, NIT: 52155798.T, “Analisa Penurunan Kerja Cargo Oil
Pump Turbine di MT.GEDE”, Skiripsi, Program Diploma IV Jurusan
Teknika, PIP Semarang, Pembimbing I: Agus Hendro Waskito.,MM.,
M.Mar.E, Pembimbing II: Darul Prayoga, M.Pd
Cargo oil pump turbine merupakan permesinan bantu yang digunakan
di kapal MT. GEDE untuk media pemindahan setiap muatanya.. Pada saat
kapal ssaat sedang melakukan cargo operation. Terjadi kelainan pada cargo
oil pump turbine nomor 2 tersebut dimana rotation per minute (rpm) pompa
menurun dari 1000 rpm menjadi 500 rpm. Akibatnya mengganggu proses
cargo operation yang sedang berlangsung. Karena kejadian tersebut sangat
merugikan banyak pihak maka dari itu penulis tertarik untuk melakukan
penelitian yang berjudul “ANALISA PENURUNAN KERJA CARGO OIL
PUMP TURBINE DI MT.GEDE”
Penelitian dilakukan dengan mengumpulkan data berupa observasi,
wawancara, dan studi pustaka yang akan di reduksi menggunakan fishbone
analysis. Karena dengan fishbone analysis dapat diketahui cause and effect
dari masalah yang terjadi di tempat penulis melakukan penelitian.
Dari hasil penelitian menggunakan metode fishbone analysis didapat
penurunan kerja dari cargo oil pump turbine terjadi karena menurunya
kevakuman yang ada pada kondensor yang diakibatkan oleh terlambatnya
melakukan pengecekan rutin pada kondensor tersebut. sehingga mengganggu
proses kondensasi yang dilakukan. Sehingga menghambat aliran steam dari
exhaust turbine.


ABSTRACT
Dimas August S, 2019, NIT: 52155798.T, “Decrease Analysis Working of Cargo
Oil Pump Turbine on MT. GEDE”, Thesis, Diploma IV Technical,
Merchant Marine Polytechnic Semarang, Supervisior I: Agus Hendro
Waskito.,MM., M.Mar.E. Supervisior II: Darul Prayoga, M.Pd
Cargo oil turbine pump is an auxiliary engine used on MT. GEDE for
media transfer for every load. When the ship is carrying out cargo operations.
An abnormality occurs in the turbine number 2 cargo oil pump, where the
rotation per minute (rpm) of the pump decreases from 1000 rpm to 500 rpm.
As a result, it interferes with the ongoing cargo operation process. Because
the incident is very detrimental to many parties, therefore the author is
interested in conducting a study entitled "ANALYSIS OF CARGO OIL
PUMP TURBINE REDUCTION IN THE MT. GEDE"
The study was conducted by collecting data in the form of observations,
interviews, and literature studies that will be reduced using fishbone analysis.
Because with fishbone analysis can be known the causes and effects of
problems that occur where the authors conduct research.
From the results of research using the fishbone analysis method, it is
found that the decrease in work of the turbine cargo oil pump occurs because
of the decline in the vacuum in the condenser which is caused by the delay in
conducting routine checks on the condenser. so that it interferes with the
condensation process. Thus inhibiting the flow of steam from the exhaust
turbine.