Integrated Transport Resource Catalog

Pepustakaan Pusat Kementerian Perhubungan Republik Indonesia

Title
OPTIMALISASI PERAWATAN CLAMSHELL ELECTRO HYDRAULIC GRAB GUNA MENDUKUNG KELANCARAN PROSES BONGKAR MUAT DI MV.KT 02
Collection Location
Repository PIP Semarang
Edition
Call Number
ISBN/ISSN
Author(s)
RESA, GIOFANI
Subject(s)
Teknika
Classification
Series Title
GMD
Electronic Resource
Language
Publisher
Publishing Year
2024
Publishing Place
Collation
Abstract/Notes
INTISARI
Resa Giofani. NIT. 52155754T, 2020 "Optimalisasi perawatan clamshell electro
hydraulic grab guna mendukung kelancaran proses bongkar muat di
MV.KT 02", Diploma IV Program, Teknika, Politeknik Ilmu Pelayaran
Semarang, Pembimbing I: F.Pambudi Widiatmaka,S.ST.,M.T. dan
Pembimbing II: Yustina Sapan,S.ST.,MM
Pelaksanaan bongkar muat yang sering mengalami keterlambatan.
Penyebab terjadinya keterlambatan dalam proses bongkar muat dikarenakan
kerusakan pada clamshell electro hydraulic grab akibat tidak optimalnya
perawatan. Peneliti melakukan penelitian dengan tujuan mencari apa saja
penyebab tidak optimalnya perawatan dan bagaimana cara
mengatasinyaBerdasarkan penelitian yang telah dilaksanakan diatas kapal dengan
menggunakan data-data yang ada dan melihat situasi di lapangan, maka penulis
mendapatkan gambaran mengenai materi diatas beserta kendala-kendalanya dalam
menunjang pengoperasian kapal terutama mengenai alat bongkar muat (clamshell
electro hydraulic grab) untuk mencari penyelesaian masalah terhadap penyebab
kurang maksimalnya fungsi clamshell electro hydraulic grab yang megakibatkan
terganggunya proses bongkar muat di MV. KT 02.
Metode penelitian ini menggunakan metode fishbone. Sumber data yang
dikumpulkan dalam penyusunan skripsi ini diperoleh dari sumber data primer dan
sumber data sekunder. Metode pengumpulan dan penarikan data menggunakan
teknik observasi, wawancara, studi pusaka dan studi dokumentasi.Dari hasil
penelitian yang penulis lakukan, maka ditemukan faktor-faktor penyebab kurang
optimalnya perawatan clamshell electro hydraulic grab antara lain : perawatan
yang tidak sesuai prosedure.clamshell electro hydraulic grab yang sudah tua
mengakibatkan sering terjadi kerusakan seperti pipa hight pressure yang bocor,
joint point conector yang berkarat, terbakarnya elektro motor, serta tidak
tersedianya spare part. Tindakan yang dilakukan untuk mengatasi agar clamshell
electro hydraulic grab berfungsi secara maksimal yaitu melakukan perawatan
secara berkala, tersedianya spare part.
Kesimpulan dari hasil penelitian yaitu melakukan perawatan clamshell
electro hydraulic grab secara terjadwal serta tersedianya spare part di kapal dapat
meminimalisir terjadinya kerurakan pada clamshell electro hydraulic grab proses
bongkar muat dapat berjalan dengan lancar. Perencanaan pembentukan organisasi
kerja yang dilakukan pada safety meeting sebelum melaksanakan pekerjaan, peran
perwira dalam mengawasi semua pekerjaan, serta peralatan yang dapat menunjang
kelancaran seluruh rangkaian pekerjaan.



ABSTRACT
Resa Giofani. NIT 52155752, 2020 "Optimalitation maintenance grabs to
maximize the loading discharge process on MV. KT 02 ", Diploma IV
Program, Technical, Merchant Marine Polytechnic Semarang, Advisor I:
F.Pmbudi Widiatmaka,S.T.,M.T and Yustina Sapan,S.T.,MM
The implementation of the cargo loading process that often experiences
delays in the loading process, the cause of the delay in the loading process due to
damage to the grab and the lack of ready grab conditions in its maintenance. The
researcher conducts research with the aim of finding out what are the causes of
delay and how to overcome them.Based on the research that has been carried out
on the ship using existing data and looking at the situation in the field, the authors
get an overview of the above material along with the constraints - constraints in
supporting the operation of the ship, especially regarding tools to clamshell
electro hydraulic grab problems to solve the causes of lack of the maximum grab
function that results in disruption of the loading cargo process in the MV. KT 02.
The research method with a research approach uses fishbone methods.
The source of data collected in the preparation of this thesis is obtained from
primary data sources and secondary data sources. Methods of collecting and
withdrawing data using observation, interviews, heritage studies and
documentation studies.From the results of the research that the authors did, it was
found that the causes of the lack of optimal maintenance of clamshell electro
hydraulic grab include: difference prosedure maintenance clamshell electro
hydraulic grab. Hight pressure pipe leaked, rusty joint point connector
grab,electro motor cis burn, unavailability of spare parts, grabbed cable grab, lack
of knowledge and skills crew of the ship. Actions taken to overcome the grab
function optimally, namely maintenance periodically, the availability of spare
parts.
Conclusions from the results of the research, namely the planning and
planning in handling the works on board that are related to maintenance can work
well. Planning the establishment of work organizations carried out in safety
meetings before carrying out work, the role of officers in supervising all work,
and equipment that can support the smooth running of the entire series of work
Specific Detail Info
//repository.pip-semarang.ac.id/2576/