ABSTRAKSI
Zulhafiz Zahir Rasyid, 2019, NIT: 51145234 N, “Perhitungan muatan batu bara dengan metode draft survey di MV. Shanthi Indah”, Program studi Nautika, Program Diploma IV, Politeknik Ilmu Pelayaran Semarang, Pembimbing I: Capt. I Kadek Laju, S.H, M.M, M.Mar, Pembimbing II: Poernomo Dwiatmojo, S.H, M.H.
Draft Survey merupakan sarana penting dalam perhitungan jumlah muatan yang telah dimuat atau dibongkar dari kapal, penelitian ini bertujuan untuk prosedur pelaksanaan perhitungan jumlah muatan, cara perhitungan draft survey antara cara manual dan dengan rumus program di MV. Shanthi Indah. Constant merupakan nilai berat di atas kapal yang tidak dapat diperkirakan, constant dihitung setelah pelaksanaan initial draft survey pada saat kapal tiba di pelabuhan muat. Sedangkan total cargo dapat dihitung setelah pelaksanaan final draft survey yang dilakukan setelah kegiatan memuat selesai dilaksanakan.
Metode penelitian yang digunakan adalah kuantitatif, dengan teknik pengumpulan data berdasarkan hasil observasi dan wawancara. Prosedur data yang diarahkan untuk menjawab rumusan masalah telah dirumuskan dalam proposal. Hasil penelitian menunjukkan (1) prioritas prosedur pelaksanaan perhitungan jumlah muatan draft survey di MV. Shanthi Indah (2) cara perhitungan draft survey yang diterapkan di MV. Shanthi Indah dengan menerapkan koreksi draft, trim dan density.
Kesimpulan penelitian ini menunjukkan bahwa (a) prosedur pelaksanaan perhitungan jumlah muatan draft survey di MV. Shanthi Indah sesuai dengan ketetapan UN ECE, (b) keseluruhan cara perhitungan draft survey di MV. Shanthi Indah sesuai dengan cara perhitungan draft survey UN ECE forms.
ABSTRACT
ZulhafizZahirRasyid, 2019, NIT: 51145234 N, “Calculation of coal load with the draft survey method in MV. Shanthi Indah”,NauticalDeepartment, Diploma IV Program, Merchant Marine Polytechnic of Semarang, Material Advicer(I): Capt. I KadekLaju, S.H, M.M, M.Mar., Methodology Advicer (II): PoernomoDwiatmojo, S.H, M.H.
Draft Survey is an important means in calculating the loaded cargo or unloaded cargo from the vessel, this research goals are to know the steps of procedure for calculating total cargo, how to calculate the draft survey and the cause of differences in the results of calculations between the manual and the formula of the program in the MV. Shanthi Indah.Constant is weight on board that undetermined, constant calculated after the implementation of the initial draft survey at the time the vessels at the loading port, while the total cargo can be calculated after the final draft survey conducted when the loading activity has been completed.
The research method used is quantitative, with data collection techniques based on the results of observations and interviews. Data procedure directed to answer the problem formulation has been formulated in the proposal. The results of the study show (1) priority procedure for calculating the draft survey loads in the MV. Shanthi Indah (2) how to calculate the draft survey applied in the MV. Shanthi Indah by applying draft, trim and density corrections.
The conclusion of this study shows that (a) the implementation procedure for calculating the total draft survey loads in the MV. Shanthi Indah is in accordance with the provisions of the UN ECE, (b) the overall method of calculating the draft survey in the MV. Shanthi Indah according to how to calculate the draft survey of the UN ECE forms.