Integrated Transport Resource Catalog

Pepustakaan Pusat Kementerian Perhubungan Republik Indonesia

Title
OPTIMALISASI KEGIATAN BONGKAR MUAT CURAH BATU BARA PADA MV. LUMOSO PERMAI DI PLTU NAGAN RAYA MEULABOH ACEH
Collection Location
Repository PIP Semarang
Edition
Call Number
ISBN/ISSN
Author(s)
YAMA, WICAKSONO
Subject(s)
Nautika
Classification
Series Title
GMD
Electronic Resource
Language
Publisher
Publishing Year
2024
Publishing Place
Collation
Abstract/Notes
Yama Wicaksono, 50134859. N, 2018, "Optimization of Loading and Unloading Activities of Coal At MV. Lumoso Permai In PLTU Nagan Raya Meulaboh Aceh", Nautica Study Program, Diploma IV Program, Merchant Marine Polytechnic of Semarang, 1st Supervisor: Capt. Rudy Susanto, M.Pd., 2nd Supervisor: Laksmi Setyorini, S.Pd., M.Si.

Delays during unloading process is the most untoward thing for anyone, because it can inflict disadvantage many parties specially for company and the owner of the cargo. Such a case at MV. Lumoso Permai when loading and unloading acivities in PLTU Nagan Raya Meulaboh Aceh. The constraints caused by weather condition and also waiting for the barge come, it caused loading and unloading process on the vessel isn’t optimal, therefore proper handling is expected to make the loading and unloading process to be optimal.

The method used in this study that researchers in conveying problem is a qualitative methods to generate descriptive data for showing and describe the object under study, with data collection techniques based on observation, interview and literatures. The writer used USG data analysis techniques (Urgency, Seriousness, Growth) to determine the issue a top priority in the oprimization of loading and unloading activities until the solutions can be found.

The results showed (1) the cause of isn’t optimal loading and unloading activities in PLTU Nagan Raya Meulaboh Aceh (2) the solution of loading and unloading activities to be optimal. The conclusion of this indicate that (1) weather is a dominant factor that causes loading and unloading activites not to be optimal (2) the solutions is increase the number of fenders and do towing on the vessel when loading and unloading activities.

Keyword: Optimization, (USG) method, loading and unloading
Specific Detail Info
//repository.pip-semarang.ac.id/742/