KETERLAMBATAN PEMBONGKAR KERUSAKAN Diajukanguna DisusunOleh: PROGRAM STUDI NAUTIKA i PEMBONGKARAN KONTAINER AKIBAT CELL GUIDE DI KAPAL MV. MERATUS BALIKPAPAN 1
Collection Location
Repository PIP Semarang
Edition
Call Number
ISBN/ISSN
Author(s)
MUHAMMAD, KAMAL NUGROHO
Subject(s)
Nautika
Skripsi
Classification
Series Title
GMD
Electronic Resource
Language
Publisher
Publishing Year
2024
Publishing Place
Collation
Abstract/Notes
Muhammad Kamal Nugroho, 2018, 50134881.N, “Delay of Container
Destruction Due to Damage of Cell Guide on Ship MV. Meratus
Balikpapan 1”, Nautical essay Nautical Study, Diploma IV Progam,
Semarang Merchant Marine Politechnic, Counselor I: Capt. I Kadek Laju,
S.H., M.M. M.Mar., dan Counselor II: Agus Hendro Waskito, M.Mar.E.
Delay of containers unloading may occur on board. Delay can be caused
by several factors from the ship (internal) and external (external) factors. The
delay of discharging happened on MV. Meratus Balikpapan 1 caused by a
container crane spreader concerning the cell guide of the hold and cannot be
lifted.
The method used by the researcher to overcome the problem is descriptive
qualitative so that writer can expose the delay of dismantling of container in MV.
Meratus Balikpapan 1. In determining the priority of the problem to be resolved,
the researcher uses an approach tool that is USG (Urgency, Seriousness, Growth)
method by giving score 1-5 on the cause of the happening of work accident in
MV. Meratusbalikpapan 1. Researchers conduct interviews with Skipper and
Chief Officer. Researchers also take pictures to support the validity of research
data.
The result of research indicates, factors causing the delay of discharging
is less of skill by operator container crane in the operation of unloading
containers and also less of discipline of the duty officer, foreman, and labor
inspector during the process of unloading the container. Efforts are made to
prevent delays in the discharge of containers by increasing the crane capability of
operators, increasing discipline while carrying out the duty office during the
process of discharging, and improving coordination between ships and foreman
or laborers.
From the results of the study it can be concluded that the delay of
discharging the container on board the MV. Meratus Balikpapan 1 is a less of
discipline supervision of duty officers, foreman, laborers and less of skill of
operator container crane.
Keywords: Delay, Demolition, Supervision, Ship Duty.