Integrated Transport Resource Catalog

Pepustakaan Pusat Kementerian Perhubungan Republik Indonesia

Title
UPAYA MEMPERLANCAR PROSES BONGKAR MUAT PUPUK UREA CURAH DIATAS KAPAL MV. FEDERAL KIBUNE
Collection Location
Repository PIP Semarang
Edition
Call Number
ISBN/ISSN
Author(s)
ADI, JENDRI SOEKI
Subject(s)
Nautika
Skripsi
Classification
Series Title
GMD
Electronic Resource
Language
Publisher
Publishing Year
2024
Publishing Place
Collation
Abstract/Notes
ABSTRACT
Adi Jendri Soeki, NIT. 50134767. N, 2018, “Effort of overcome the delay loading and unloading process of bulk fertilizer on MV. Federal Kibune”, Diploma IV program, Nautical, Merchant marine polytechnic of Semarang, lecture I: Capt. Marihot Simanjuntak, M.M., and lecture II: Vega Vonsula Andromeda, S.ST, S.Pd,
The development of sea transportation is now advancing so rapidly, especially in terms of port. If talking about the port, then talking about ship. In addition to being used as a means of sea transportation, the vessel is also used in the process of loading and unloading at the port. In the implementation of constraints in the process of loading and unloading is still exist. The obstacle that occur in process unloading, among others, the occurrence of damage to the unloading equipment and clumping on the load carried the bulk fertilizer. Then through these obstacles, the author takes the title “Effort of overcome the delay unloading process of bulk fertilizer on MV. Federal Kibune”.
In the theoretical foundation contains some theory which is like the definition of loading and unloading which is an activity of load or unload with using crane/conveyor or the other equipment.
In accordance with scientific principles, in the writing of this essay, the author uses the method of research that is SWOT method ((Strength, Weakness, Opportunity and Threats) with using data collection techniques, i.e. by observation, interview and literature study on the MV. Federal Kibune during the implementation sea project.
Form the results of research during the implementation of sea project on vessel, the authors found an obstacle which result in delay in the process of loading and unloading of bulk fertilizer. The damage to unloading equipment is due to lack of regular maintenance and company delay in spending spare part. For clumping on the load caused by contaminated loads with water and poorly maintained fertilizer quality.
The conclusion of the research is that the process of unloading the cargo on MV. Federal Kibune is not always running smoothly. The delay constraints caused by the damage to unloading equipment and clumping on the load. For that by doing regular maintenance and compacting the existing load, then the process of unloading is expected run smoothly.
Key word : delay time, tool breakdown