Prabowo Hadi Hartantyo, 2016, NIT: 49124395.N, “The Implementation
Process of Hydro Pipe Pressure Test Cargo on Board MT. John
Caine”, Nautical Departement, Program IV Diploma, Merchant Marine
Polytechnic of Semarang, 1st Supervisor: Capt. Dwi Antoro MM,
M.Mar. 2nd Supervisor: SRI SUYANTI, SS, Msi.
Premium composed of straight chain hydrocarbons, ranging from
C7 (heptane) to c11. In other words, gasoline is made of molecules
consisting only of hydrogen and carbon that is bonded with each other
to form a chain. Based on the research results, “the implementation
process of hydro pipe pressure test cargo on board MT. John Caine”
experienced failure due to several obstacles both on the crew readiness
factor in providing the necessary facilities and equipment of factors.
Therefore, the authors are interested to lift the formulation of the
problem to be discussed in the title.
The author uses a qualitative method of case studies to outline the
cases that occurred aboard the research object and explain the efforts
made to overcome the obstacles of the crew readiness factor in
providing the necessary facilities and equipment of factors that are not
under normal conditions. Among other things that occur during the
process of implementation of hydro pressure test is the knowledge of
some of the crew were still lacking, a lack of coordination between the
ship with relevant parties and unloading equipment not under normal
conditions. Attempts to overcome them by increasing knowledge of the
crew to conduct the introduction and training to the entire crew deck on
the implementation of hydro pressure test the pipeline load, duties and
responsibilities of each, enhanced coordination between the crew deck
with crew related machinery as well as perform routine maintenance the
means of implementation of hydro pressure test and other support
equipment.
Conclusion The execution hydro pressure test can run smoothly
when the crew of the vessel has the readiness to provide the necessary
means, knowledge and a greater understanding on the implementation
of hydro pressure test, understand and skilled in operating the
equipment, can do a good coordination with the parties involved as well
as all equipment dismantling in good condition and well.
Keywords: Oil Product, Execution, Hydro Pressure Test