Integrated Transport Resource Catalog

Pepustakaan Pusat Kementerian Perhubungan Republik Indonesia

Title
MANAJEMEN PERAWATAN DAN PERBAIKAN ALAT BONGKAR MUAT DI KAPAL MV. KEOYANG NOBLE
Collection Location
Repository PIP Semarang
Edition
Call Number
ISBN/ISSN
Author(s)
ADI, BANGGA SAPUTRA
Subject(s)
Nautika
Skripsi
Classification
Series Title
GMD
Electronic Resource
Language
Publisher
Publishing Year
2024
Publishing Place
Collation
Abstract/Notes
Adi Bangga Saputra, 2017, NIT: 50134740.N, “Maintenance and Upgrade
Management of loading and unloading Equipment on MV Ships.
Keoyang Noble”, Diploma IV, Nautical, Semarang Merchant Marine
Polytechnic, First guide: Capt. Samsul Huda, MM, M.Mar., Second
guide: Ir.Fitri Kensiwi, M.Pd.
Loading and unloading activities must run on time in accordance with the
predicted schedule, then in carrying out the loading and unloading equipment is one
important factor for the loading process to run smoothly. Based on these facts the
authors are interested to make a thesis with the title "Management Maintenance and
Repairing Tools Loading on ships MV. Keoyang Noble ". Problems that the author
lift that is: the management of maintenance and repair of loading and unloading
equipment on the ship MV. Keoyang Noble, how the Standard Operating Procedure,
whether there are differences and constraints of both, and what efforts are made to
overcome them. If in such a difference becomes a problem then the need for
evaluation that must be followed up. And if there are any obstacles or constraints it
must be sought solutions to overcome these problems. In this thesis, the research
method used is the method of USG (Urgency Seriousness, and Growth) which is
observative by observing the existing activities and methods of interviews are
conducting interviews directly to the crew on the loading and unloading equipment as
well as maintenance.
Based on the analysis that has been done, that the management of loading and
unloading equipment on the ship implement preventive maintenance and maintenance
breakdown, while the Standard Operating Procedure implementation such as Manual
Instruction Book is periodic maintenance. Obstacles experienced in this
implementation is the insecurity that still happens. So researchers try to make efforts
in overcoming these obstacles and make some efforts related to maintenance
management and repair of loading and unloading tools.
From the results of the analysis, it can be concluded that the management of
maintenance and repair of loading and unloading equipment needs to be planned. The
planned care method is carried out properly and regularly in accordance with the
programmed schedule, so that damage to the loading and unloading equipment can be
avoided and the loading and unloading equipment is ready for use.
Keywords: Standard Operating Procedure, Manual Instruction Book, Preventive
Maintenance, Breakdown Maintenance, Ultrasound.
Specific Detail Info
//repository.pip-semarang.ac.id/184/