Integrated Transport Resource Catalog

Pepustakaan Pusat Kementerian Perhubungan Republik Indonesia

Title
Application of Prefabricated Vertical Drain (PVD) for Basic Soil Stabilization in the Railway Double Track Construction Project at Km 437 + 300 to Km 438 + 500 Gombong, Kebumen
Collection Location
Jurnal Perkeretaapian Indonesia
Edition
Call Number
ISBN/ISSN
2550-1127
Author(s)
Astuti, Septiana Widi
Prativi, Ayu
Ependi, Ahmad
Subject(s)
Kereta Api
train
land subsidence
heap
prefabricated vertical drain (PVD)
double track
penurunan tanah
timbunan
jalur ganda
Classification
Series Title
GMD
Electronic Resource
Language
eng
Publisher
Politeknik Perkeretaapian Indonesia Madiun
Publishing Year
2019
Publishing Place
Collation
Abstract/Notes
The subgrade in the railway double track development project in KM 437 + 300 to KM 438 + 500 Gombong, Kebumen is soft land (N-SPT <15) so that it requires efforts to improve the land to avoid land subsidence exceeding the allowable land subsidence, which is equal to 20cm In this research, an effort to repair subgrade uses Prefabricated Vertical Drain (PVD) to accelerate the process of soil congestion due to the load of the railroad pile, the burden of railroad construction, and the burden of the passing railroad. Compression analysis results show that the subgrade will experience a land subsidence of 0.524m. The natural consolidation time needed to achieve a 90% degree of consolidation is 268.9 years. Meanwhile, the time of consolidation to reach a degree of consolidation of 90% using PVD spaced 0.8 m with a triangle and quadrilateral pattern is for 15 weeks and 18 weeks. Planting PVD in both patterns is as deep as 24 m
Specific Detail Info
https://jurnal.ppi.ac.id/jpi/article/view/61