Integrated Transport Resource Catalog

Pepustakaan Pusat Kementerian Perhubungan Republik Indonesia

Title
Estimation of Geothermal Potential as a Power Supply (Reactivation Planning of the Madiun Slahung Ponorogo Railroad
Collection Location
Jurnal Perkeretaapian Indonesia
Edition
Call Number
ISBN/ISSN
10.37367/jpi.v2i2
Author(s)
Aghastya, Adya
Sunardi, Sunardi
Wirawan, Willy Artha
Subject(s)
listrik
Electric
reaktifasi
recoverable energy
reactivation
recoverable
energy
Classification
Series Title
GMD
Electronic Resource
Language
eng
Publisher
Politeknik Perkeretaapian Indonesia Madiun
Publishing Year
2018
Publishing Place
Collation
Abstract/Notes
This study aims to measure the reserve of geothermal energy for the use of alternative energy as a supply of reactive power planning for the Madiun-Ponorogo railway line. This research is a type of exploratory research that is qualitative and descriptive. The results showed that geothermal power is usually expressed as power in the electric capacity of the extraction period for a projection of 30 years. Power is calculated to reach 1900,04074 GWe, and the power is extracted by 50% percent to 950,0203700545 GWe as recoverable energy. After the recovery factor is obtained, the power output in the form of electricity is 228,0048888 GW so that it has the potential as an alternative energy supply.
Specific Detail Info
https://jurnal.ppi.ac.id/jpi/article/view/52