Integrated Transport Resource Catalog

Pepustakaan Pusat Kementerian Perhubungan Republik Indonesia

Title
NORMALISASI DRAINASE APRON B-C DI BANDAR UDARA HUSEIN SASTRANEGARA BANDUNG
Collection Location
Jurnal Ilmiah Aviasi PPI Curug
Edition
Call Number
ISBN/ISSN
1979-1534
Author(s)
Oka Fatra
Djoko Priambodo
Agie Santoso Margono
Subject(s)
Apron
box culvert
man hole
u-ditch precast
hollow steel rod
besi hollow
Classification
Series Title
GMD
Electronic Resource
Language
eng
Publisher
Politeknik Penerbangan Indonesia Curug
Publishing Year
2018
Publishing Place
Collation
Abstract/Notes
Right now, Husein Sastranegara International Airport have a drainage problem, clogged frequent, flooded, and some parts of trails cover are damaged because it is age in Apron B-C Airside. Therefore have to repair it, them is drainage trails cover change, clean the sediment so there is no clogged anymore. In the to make the drainage system condition (2015 KP 39 or FAA AC 150_5320_5c). The daily rain maximum data obtained from BMKG rain station location in Husein Sastranegara International Airport for the total if 30 years. This rain data will processed of analysis top of flood debit. Meanwhile, the new drainage model using a closed channel using a box culvert precast with 90 x 90 x 9 dimension. To accommodate drainage channel inlet, will create an open channel segment which is in same time serves as man hole using u-ditch precast followed cover from hollow steel. This inlet or man hole are placed every 50 meter.
Specific Detail Info
https://journal.ppicurug.ac.id/index.php/jurnal-ilmiah-aviasi/article/view/217